FINAL DRIVE
7.3
11. With short, sharp jerks, remove drive shaft from
front gearcase.
FRONT DRIVE AXLE
INSTALLATION
1. Install new spring ring on drive shaft. Apply an
anti--seize compound to splines. Align splines of
drive shaft with front gearcase and install by
lightly tapping on drive shaft with rubber faced
hammer.
2. Install drive shaft in strut.
3. Install lower ball joint, torque nut to 25 ft. lbs. (34.5
Nm) and install new cotter pin.
4. Install hub and tighten hub nut to 70 ft. lbs. (95
Nm).
New Cotter Key
Front Hub Retaining Nut Torque
70 ft. lbs. (95 Nm)
DRIVE SHAFT (CV) BOOT
INSPECTION
Check the front and rear driveshaft cv boots for any
tears or leaking grease. If the driveshaft boot loses all
of the grease cv joint failure will occur.
Summary of Contents for Sportsman 800 Efi 2005
Page 116: ...ENGINE 3 62 NOTES ...
Page 136: ...FUEL SYSTEM FUEL INJECTION 4 20 NOTES ...
Page 186: ...CLUTCH 6 30 NOTES ...
Page 256: ...BRAKES 9 24 NOTES ...
Page 292: ...ELECTRICAL 10 36 BASIC WINCH WIRING 2005 ATV MODELS 2005 ATV WINCH WIRING DIAGRAM ...
Page 300: ...ELECTRICAL 10 44 NOTES ...
Page 301: ...ELECTRICAL 10 39 WIRING DIAGRAM 2005 SPORTSMAN 700 800 EFI Stator ...
Page 302: ...ELECTRICAL 10 40 WIRING DIAGRAM 2005 SPORTSMAN 700 800 EFI ...