Politec Srl | Manual MANA DT SMA + DT3
–
Ver 2.5.2
7
2.1
CABLE PIT POSITIONING
The placement of the cable pit for MANA columns, after assembling, have to be done in the following way:
cement all around the cable pit keeping the top edge of it at same level of ground.
POSSIBLE CORRECTION OF THE INCORRECT
POSITIONING
Placement should be perpendicular to the ground. If the base is not in perfectly at ground level, is possible to
adjust it through the insert regulation of cable pit.
On the side that must be corrected loosen the insert in order to get the right inclination.
CORRECT POSITIONING
BY ADJUSTING INSERTS
EXAMPLE
OF SETTING
WRONG POSITIONING