The

 

G

40

 

Base

 

and

 

PG

40

 

Base

 

Industrial

 

Footing

 

covered

 

by

 

the

 

present

 

operation

 

manual

 

comply

 

with

 

the

 

requirements

 

of

 

the

 

AT

0112

0298/2011

 

Technical

 

Approval

 

issued

 

by

 

the

 

Scientific

 

and

 

Research

 

Centre

 

for

 

Fire

 

Protection

 

(CNBOP).

  

 

The

 

G

40

 

Base

 

and

 

PG

40

 

Base

 

Industrial

 

Footing

 

have

 

been

 

approved

 

with

 

the

 

Certificate

 

of

 

Conformity

 

No.

 

2789/2011

 

confirming

 

their

 

compliance

 

with

 

the

 

Technical

 

Approval

 

issued

 

by

 

CNBOP.

 

 

The

 

Certificate

 

may

 

be

 

downloaded

 

from

 

the

 

manufacturer’s

 

www.polon

alfa.pl

 

web

 

site.

 

 

The

 

national

 

declaration

 

of

 

compliance

 

No.

 

2PI/E287/2011

 

dated

 

15.12.2011

 

is

 

available

 

on

 

request

 

from

 

the

 

manufacturer.

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Read

 

the

 

manual

 

carefully

 

before

 

assembling

 

and

 

operation

 

of

 

the

 

base

 

and

 

the

 

base

 

industrial

 

footing.

 

 

Any

 

nonconformity

 

with

 

the

 

instructions

 

contained

 

in

 

the

 

manual

 

may

 

be

 

harmful

 

or

 

may

 

cause

 

violation

 

of

 

the

 

law

 

in

 

force

  

 

POLON

ALFA

 

bears

 

no

 

responsibility

 

for

 

any

 

damage

 

resulting

 

from

 

usage

 

inconsistent

 

with

 

the

 

manual.

  

 

 

 

 

 

 

 

The

 

product

 

contains

 

parts

 

that

 

can

 

be

 

dangerous

 

for

 

human

 

health.

 

Waste

 

products

 

shall

 

be

 

passed

 

to

 

the

 

nearest

 

waste

 

electric

 

and

 

electronic

 

equipment

 

collection

 

point.

 

 

 

 

 

 

NOTE:

 

The

 

manufacturer

 

reserves

 

the

 

right

 

to

 

change

 

specifications

 

of

 

products

 

at

 

any

 

time

 

 

without

 

prior

 

notice.

  

 

 

Summary of Contents for G-40

Page 1: ...G 40 DETECTOR BASE PG 40 BASE INDUSTRIAL FOOTING Installation and Maintenance Manual IK E287 001GB IIIG Edition ...

Page 2: ...onal declaration of compliance No 2PI E287 2011 dated 15 12 2011 is available on request from the manufacturer Read the manual carefully before assembling and operation of the base and the base industrial footing Any nonconformity with the instructions contained in the manual may be harmful or may cause violation of the law in force POLON ALFA bears no responsibility for any damage resulting from ...

Page 3: ...ing equipped with the PG7 sealing gland and the PSGW ceiling suspended base The suspended part of the base should be mounted on a 4 cord cable of 2 x 2 x 0 8 size Both the PG7 sealing gland and the PSGW ceiling suspended base are not standard equipment of the base and should be ordered separately In the case of the G 40 base installation in places where risk it can be endangered by a mechanical da...

Page 4: ...embracing the main connector with self clamping latches to connect detection line wires and an additional connector to fix the wire screens The base may be additionally equipped with the P 40 masking ring optional The mechanical structure of the G 40 base is shown in Fig 1 and Fig 2 Fig 1 G 40 base elements main view Fig 2 G 40 detector base mechanical design ...

Page 5: ...y it is equipped with the PG7 sealing gland The mechanical structure of the PG 40 base industrial footing is shown in Fig 3a and Fig 3b assembling instructions for the suspended base are presented in Fig 4 The mechanical structure of the OZ 40 protection cover is shown in Fig 5 Fig 3a PG 40 base industrial footing mechanical design Fig 3b PG 40 base industrial footing and PG7 sealing gland main vi...

Page 6: ...IK E287 001GB 5 Fig 4 G 40 suspended base assembling Fig 5 OZ 40 protection cover ...

Page 7: ...f the base into the POLON 4000 system detection line The fig 8 shows how the bases should be installed in conventional control panel detection lines Continuity of a detection line is obtained only in the event all detectors are placed in their bases The line continuity may be achieved when the E287 04 00 jumper Fig 6 is placed into the detector connector The jumper is optional and should be ordere...

Page 8: ...h two screws placed in extension anchor bolts Ø6 mm bolts are recommended It is advised to drill the anchor bolt holes using a pattern with 127 mm hole spacing Improper hole spacing may result in the base industrial footing deformation when the screws are strongly tightened The PG 40 base industrial footing can be installed on a horizontal steel string Ø8 mm diameter recommended using clamping ban...

Page 9: ... mm hole spacing Improper hole spacing may result in the base industrial footing deformation when the screws are strongly tightened For wire connection a flat screw driver max edge width at 3 5 mm use is recommended it should be pushed see Fig 9 into the proper connector hole Then the wire closer to the ceiling should be placed into the hole and the screw driver should be taken off It is advised t...

Page 10: ...between 0o C to 40o C and relative humidity between 40 and 80 free of caustic gases and vapours Detector bases and base industrial footings should not be exposed to direct sun and heating elements influence The storage period of the detector bases and base industrial footings in transport packages should not exceed 24 months 8 TRANSPORTATION The G 40 bases and PG 40 base industrial footings should...

Reviews: