IK-E287-001GB 7
Fig.
8
G
‐
40
base
installation
in
conventional
control
panel
detecting
lines
5
INSTALLATION
5.1
Initial
installation
The
PG
‐
40
base
industrial
footing
should
be
mounted
on
the
ceiling
with
two
screws
placed
in
extension
anchor
bolts
(Ø6
mm
bolts
are
recommended).
It
is
advised
to
drill
the
anchor
bolt
holes
using
a
pattern
with
127
mm
hole
spacing.
Improper
hole
spacing
may
result
in
the
base
industrial
footing
deformation
when
the
screws
are
strongly
tightened.
The
PG
‐
40
base
industrial
footing
can
be
installed
on
a
horizontal
steel
string
(Ø8
mm
diameter
recommended)
using
clamping
bands.