background image

 IK-E287-001GB 8 

The

 

PG

40

 

suspended

 

version

 

is

 

installed

 

with

 

a

 

help

 

of

 

the

 

PG7

 

sealing

 

gland

  ‐ 

Ø13mm

 

diameter

 

hole

 

should

 

be

 

drilled

 

in

 

the

 

detector

 

body

 

where

 

a

 

cable

 

of

 

max

 

Ø7

 

diameter

 

is

 

placed

 

to.

  

The

 

PSGW

 

ceiling

 

suspended

 

base

 

is

 

to

 

be

 

used

 

for

 

ceiling

 

mounting.

 

 

5.2

 

Base

 

installation

 

The

 

G

40

 

base

 

installation

 

method

 

must

 

comply

 

with

 

the

 

type

 

of

 

the

 

basis

 

where

 

the

 

detector

 

is

 

to

 

be

 

mounted:

 

 

in

 

the

 

case

 

of

 

brick

 

or

 

concrete

 

ceilings

 

it

 

is

 

enough

 

to

 

attach

 

the

 

base

 

with

 

two

 

screws

 

and

 

expansion

 

anchor

 

bolts

 

(Ø6

 

mm

 

bolts

 

are

 

recommended

 

 

in

 

the

 

case

 

of

 

plasterboard

 

it

 

is

 

forbidden

 

to

 

fasten

 

the

 

base

 

directly

 

to

 

the

 

plasterboard

 

with

 

screws;

 

it

 

is

 

recommended

 

to

 

use

 

special

 

bolts

 

intended

 

for

 

plasterboard

 

 

in

 

the

 

case

 

of

 

suspended

 

ceiling

 

it

 

can

 

be

 

necessary

 

to

 

use

 

additional

 

washers

 

of

 

appropriate

 

diameter

 

 

the

 

base

 

is

 

to

 

be

 

joined

 

with

 

the

 

PG

40

 

base

 

industrial

 

footing

 

using

 

latches.

 

It

 

is

 

advised

 

to

 

drill

 

the

 

expansion

 

anchor

 

bolt

 

holes

 

using

 

a

 

pattern

 

of

 

63

 

mm

 

hole

 

spacing.

 

Improper

 

hole

 

spacing

 

may

 

result

 

in

 

the

 

base

 

industrial

 

footing

 

deformation

 

when

 

the

 

screws

 

are

 

strongly

 

tightened.

 

For

 

wire

 

connection

 

a

 

flat

 

screw

 

driver

 

(max

 

edge

 

width

 

at

 

3.5

 

mm)

 

use

 

is

 

recommended,

 

it

 

should

 

be

 

pushed

 

(see

 

Fig.

 

9)

 

into

 

the

 

proper

 

connector

 

hole.

 

Then

 

the

 

wire

 

closer

 

to

 

the

 

ceiling

 

should

 

be

 

placed

 

into

 

the

 

hole

 

and

 

the

 

screw

 

driver

 

should

 

be

 

taken

 

off.

 

It

 

is

 

advised

 

to

 

use

 

a

 

short,

 

bended

 

WAGO

 

type

 

screw

 

driver

 

(3.5

 

x

 

0.5

 

mm,

 

cat.

 

No.

 

210

258)

 

that

 

is

 

available

 

for

 

purchase

 

at

 

POLON

ALFA).

 

The

 

wire

 

fixing

 

places

 

are

 

marked

 

on

 

the

 

connector

 

body.

 

Wires

 

screens

 

should

 

be

 

inserted

 

into

 

the

 

additional

 

connector

 

(the

 

joint

 

to

 

be

 

clamped

 

with

 

fingers);

 

then

 

the

 

connector

 

should

 

be

 

placed

 

between

 

the

 

rails

 

inside

 

the

 

rectangular

 

hollow

 

of

 

the

 

base.

  

 

5.3.

 

The

 

OZ

40

 

protection

 

cover

 

installation

 

The

 

OZ

40

 

protection

 

cover

 

is

 

mounted

 

on

 

the

 

ceiling

 

with

 

two

 

screws

 

and

 

expansion

 

anchor

 

bolt

 

(Ø8

 

mm

 

bolts

 

recommended).

 

The

 

bolt

 

hole

 

spacing

 

should

 

be

 

at

 

124

 

±

 

4

 

mm.

 

The

 

base

 

should

 

be

 

fixed

 

to

 

the

 

cover

 

with

 

two

 

M4

 

nuts.

 

When

 

the

 

detector

 

is

 

installed

 

in

 

the

 

base,

 

the

 

grating

 

should

 

be

 

fastened

 

with

 

three

 

M4

 

x

 

10

 

nuts.

  

 

Fig.

 

9

 

Wire

 

introducing

 

to

 

G

40

 

connector

 

Summary of Contents for G-40

Page 1: ...G 40 DETECTOR BASE PG 40 BASE INDUSTRIAL FOOTING Installation and Maintenance Manual IK E287 001GB IIIG Edition ...

Page 2: ...onal declaration of compliance No 2PI E287 2011 dated 15 12 2011 is available on request from the manufacturer Read the manual carefully before assembling and operation of the base and the base industrial footing Any nonconformity with the instructions contained in the manual may be harmful or may cause violation of the law in force POLON ALFA bears no responsibility for any damage resulting from ...

Page 3: ...ing equipped with the PG7 sealing gland and the PSGW ceiling suspended base The suspended part of the base should be mounted on a 4 cord cable of 2 x 2 x 0 8 size Both the PG7 sealing gland and the PSGW ceiling suspended base are not standard equipment of the base and should be ordered separately In the case of the G 40 base installation in places where risk it can be endangered by a mechanical da...

Page 4: ...embracing the main connector with self clamping latches to connect detection line wires and an additional connector to fix the wire screens The base may be additionally equipped with the P 40 masking ring optional The mechanical structure of the G 40 base is shown in Fig 1 and Fig 2 Fig 1 G 40 base elements main view Fig 2 G 40 detector base mechanical design ...

Page 5: ...y it is equipped with the PG7 sealing gland The mechanical structure of the PG 40 base industrial footing is shown in Fig 3a and Fig 3b assembling instructions for the suspended base are presented in Fig 4 The mechanical structure of the OZ 40 protection cover is shown in Fig 5 Fig 3a PG 40 base industrial footing mechanical design Fig 3b PG 40 base industrial footing and PG7 sealing gland main vi...

Page 6: ...IK E287 001GB 5 Fig 4 G 40 suspended base assembling Fig 5 OZ 40 protection cover ...

Page 7: ...f the base into the POLON 4000 system detection line The fig 8 shows how the bases should be installed in conventional control panel detection lines Continuity of a detection line is obtained only in the event all detectors are placed in their bases The line continuity may be achieved when the E287 04 00 jumper Fig 6 is placed into the detector connector The jumper is optional and should be ordere...

Page 8: ...h two screws placed in extension anchor bolts Ø6 mm bolts are recommended It is advised to drill the anchor bolt holes using a pattern with 127 mm hole spacing Improper hole spacing may result in the base industrial footing deformation when the screws are strongly tightened The PG 40 base industrial footing can be installed on a horizontal steel string Ø8 mm diameter recommended using clamping ban...

Page 9: ... mm hole spacing Improper hole spacing may result in the base industrial footing deformation when the screws are strongly tightened For wire connection a flat screw driver max edge width at 3 5 mm use is recommended it should be pushed see Fig 9 into the proper connector hole Then the wire closer to the ceiling should be placed into the hole and the screw driver should be taken off It is advised t...

Page 10: ...between 0o C to 40o C and relative humidity between 40 and 80 free of caustic gases and vapours Detector bases and base industrial footings should not be exposed to direct sun and heating elements influence The storage period of the detector bases and base industrial footings in transport packages should not exceed 24 months 8 TRANSPORTATION The G 40 bases and PG 40 base industrial footings should...

Reviews: