13
Ground Stake Installation in Concrete Pier
Steps
Ground stakes are set into concrete so that the top
of each stake is 12
above the top of the footing.
Ensure that the ground stakes remain plumb while
pouring the concrete.
A masons (twisted) line is attached between all four
corner stakes 6
from the top of stakes. Use a line
level to line up all the stakes at the 6
mark.
For longer structures, the masons line may need to
be supported every 50
to prevent sagging. Sight
down the line visually to check the straightness of
the line.
Masons Line
12
Maximum
Ground Stake (GS2404)
Top of
Footing
Depth of Footing
to Conform to
Local Building Codes.
Provide 27
Minimum
12
Minimum
4
Minimum Side Cover
3
Minimum Bottom Cover
Ground Stake in Concrete Pier
To save time, you can
prep all the stakes
ahead of time.
Ground Stake,
Footing Centerline
Line level
4
4
6
6
Ground Stake GS2404 Preparation
Place a mark 6
from top of stake.
Install 1 self-drilling
screw in the stake.
1/4
-14 x 1
Self-Drilling Screw
NB1809