24
Installing Wood Side Rails – 20
and 24
*** NOTE: LUMBER SUPPLIED BY OTHERS ***
Detail 5
Detail 6
Shown from inside
of structure
Detail 3
Detail 1a
Detail 1b
Detail 4
Detail 2
POLY-TEX recommends the following lumber*
• Treated 2 x 6 material for the lower rails
Perimeter distance plus 10% – 12
lengths minimum
• Owners choice of 2 x 4 or 2 x 6 material for other rail locations
Perimeter distance plus 10% – 12
lengths minimum
• Additional 10
lengths of treated material required.
Two pieces for the filler boards and three for each end
(Not required for optional Door Kits)
Notes:
1. The upper side rails are not necessary for the ground-to-ground poly
roof applications.
2. If structure was purchased with an optional Door Kit, see pages 34–37
for frame installation instructions.
• All lumber supplied by others
Details 1a – 6 are illustrated on the next page.
Instructions on this page apply to 20
& 24
FieldPro Models