41
Roll-Up Curtain Retainer Installation
Raise the Poly Curtain by turning the crank
handle on the Roll-Up Unit counterclock-
wise until the curtain is about halfway up.
Measure over 24
from the end of the lower
side rail. See illustration at right. Install a
Cradle w/ S-Hook (RC1330) at this location
using two, (2) Woodtite Screws (NB1807)
as shown in Detail A.
Install additional Cradles along the length
of the side rail every 12
-0
on center.
The Rope Brackets w/ S-Hook (RC1311)
will be installed over the Wiggle Wire Base.
Center the Brackets and use Woodtite
Screws (NB1807) to fasten the Brackets.
See Detail B.
Thread the 1/4
nylon rope through the
cradles and Rope Brackets in a zig-zag
pattern down the side of the FieldPro.
Tighten Rope and secure to the S-Hook
on the Rope Brackets at each end of the
FieldPro.
1
2
3
4
Instructions on this page apply
to 20
& 24
FieldPro Models
1/4
Nylon Rope
12
-0
Typ.
EQUAL
End P
oly not shown
EQUAL
SPACING
SPACING
2
Woodtite Screws
(NB1807)
1/4
Nylon Rope
Detail A
Woodtite Screw
(NB1807)
Bracket Assembly
with S-Hook
(RC1311)
Detail B
Cradle Assembly
with S-Hook (RC1330)