34
Safety Check
WARNING: Check thoroughly of all operations in the installation, ensuring
the system is installed correctly, esp. DC and AC voltages are in the specified
ranges of iCAN NetZero Plus.
Teble 5.8.1 Installation Checklist
Items
Notes
PV connection
External breaker is installed.
The appropriate breaker is installed as specified for iCAN
NetZero Plus.
The breaker is turned OFF.
Open-circuit voltage of PV arrays is within the allowed
range.
Positive and negative polarities are correct.
Battery
connection
There is no voltage on the battery ports.
Positive, negative and REF polarities are correct.
AC breaker
AC breaker is turned OFF.
Grid connection
External breaker is installed.
The appropriate breaker is installed as specified for iCAN
NetZero Plus.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
Generator
connection
External breaker is installed.
The appropriate breaker is installed as specified for iCAN
NetZero Plus.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
Wiring
All cables are wired tightly.
Wiring box
All wiring covers are screwed tightly.
Summary of Contents for iCAN NetZero Plus
Page 1: ...iCAN NetZero Plus User Manual V1 0 0 ...
Page 2: ......
Page 4: ...Service 7 ...
Page 13: ...9 Network Indicator Power Indicator Wiring Box Sealed Cap Run Indicator Status Indicator ...
Page 31: ...27 Communication and DC12V cable wiring Power cable wiring ...