Automatic boiler for wood pellets
19
3.7.3
External ash container
The external receiver provides space for long-term ash collection outside the burning chamber. It enables long-term
service-free operation even when using fuel with high ash content. It is attached to the boiler with a detent lever. During
boiler operation the lever must be in the lower position and the connecting piping between the boiler and the ash
receiver must be tight. Also the receiver cover must be tightly closed. Both of these requirements prevent burning fumes
release to the boiler room.
The receiver is removed by moving the detent lever to the upper position and pulling it away from the boiler.
Dispensing of the contents to the waste disposal container is best done by two people because of its weight.
Picture No. 12 Heat exchanger cleaning
Picture No. 13 External ash container
Summary of Contents for KP 12S
Page 1: ......
Page 17: ...Automatic boiler for wood pellets 16 Picture No 9 Feeder F1 4 5 1 4 5 2 4 5 3 4 5 4 4 5 5 ...
Page 28: ...Automatic boiler for wood pellets 27 Picture No 20 Ceramic grate parts placement guide ...
Page 41: ...Automatic boiler for wood pellets 40 8 3 1 2 Menu users settings ...
Page 43: ...Automatic boiler for wood pellets 42 Cleaning an ash removing Skin Time window setting ...
Page 46: ...Automatic boiler for wood pellets 45 Actual values Configuration ...
Page 52: ...Automatic boiler for wood pellets 51 Cleaning Ash removing USB Time window setting ...
Page 53: ...Automatic boiler for wood pellets 52 Load from USB Save on USB ...
Page 58: ...Automatic boiler for wood pellets 57 ...
Page 60: ...Automatic boiler for wood pellets 59 ...
Page 61: ...Automatic boiler for wood pellets 60 i ...
Page 63: ...62 Picture No 24 Principle of the modulation ...
Page 64: ...63 Picture No 25 Directory information consumption wood pellets for boiler family KP ...
Page 65: ...64 Picture No 26 Circuit diagram control unit ...
Page 66: ...65 Picture No 27 Circuit diagram module HZS 533 ...
Page 67: ...66 Picture No 28 Circuit diagram HZS 533 HZS 535 ...
Page 73: ...72 11 APPENDIX 2 REPORT ON THE PUTTING THE BOILER KP INTO OPERATION ...
Page 74: ...73 12 APPENDIX 3 SELF ADHESIVE LABEL IMPORTANT SAFETY INFORMATION ...