37
The SPA tub should be connected to the building’s electrical wiring permanently. The electrical wiring should
be equipped with the appropriate manual cut-off mechanism, enabling the opening of contacts on each power
supply pole. In addition, equipotential bondings must be made using the clamp
located on the tub
support frame. The minimum cross-section of the equalizer power cord is 4 mm
2
.
All electrical connections should be made by a qualified electrician.
For safety reasons, check the effectiveness of the anti-electric shock protection from
time to time by pressing the TEST button on the residual current device. If the power is
not turned off immediately after pressing the button, unplug the tub manually and
contact a qualified specialist. Do not use the SPA tub if the protections do not function
properly.
To make sure the tub does not switch on without water, disconnect the power supply using the above-
mentioned manual mechanism.
The bath can be connected to the water and sewage systems permanently or the
bath can be filled and drained by means of flexible hoses disconnected after each
operation. The flexible hose set of the bath includes a T-pipe with a 1/2” coupling for
filling of the bath through the hydro-massage jets. The fixed piping system includes
release valves located near the skimmer-filter; at the outlets of which fixed or
removable hose connection with the sewage system should be provided.
T-pipe with a 1/2" coupling
It is recommended that the bath is permanently connected to the sewage system due to the risk of water
overflowing through the emergency overflow system.
2.5. GROUNDING CABLE CONNECTION
In order for the residual current device and the tub itself to function properly, a
grounding cable with a cross-section of at least 2,5 mm
2
must be installed.
Connect the cable to the frame, as illustrated. Connect the other end of the cable
to the protective grounding of the building’s electrical wiring.
Place of connection of the
earthing wire
2.6. CONNECTION TO MAINS
As the bathtub is protection class I equipment it has to be permanently connected to power supply (TN-S
type) using IP X5 junction box. It is recommended to install the connection box in area I (under the bathtub)
close to other electrical devices of the bathtub (more than 20 cm above the floor).
The bathtub must never be connected using a plug.
Zone 0 is the area inside the bath.
Zone 1 is the zone 0 area plus the space up to 2,25 m above the floor.
Zone 2 is the zone 1 area extended by 0,6 m, again up to 2,25 m above the floor.
Zone 3 is the area reaching 2,4 m beyond zone 2, up to 2,25 m above the floor.
Summary of Contents for Laguna SPA
Page 1: ...SPA Bath LAGUNA SPA 213 x 213 Installation and user manual...
Page 40: ...40...
Page 42: ...42...