18
Please check the water level before entering the bath. The water level should
be from 3 to 4 cm above the skimmer. See the fi gure on the right. If the water
level is not suffi cient, the fi ltration system will not work properly. Also heating
will not be possible. Please remember about adding water from time to time to
maintain the water level.
2.5. GROUNDING CABLE CONNECTION
A grounding installation with a 2.5 mm
2
wire is necessary for the circuit breaker and safety mecha-
nisms to work properly.
2.6. MAIN CONNECTION
The power cable must be connected to the fixed power supply to an IP X5 safety level. Socket
installation is not permitted. The power installation in the wall can be connected by a junction box.
An IP X5 junction box should be in the 3rd zone, and at least 20 cm above the floor level.
According to current regulations, sockets may not be installed within zones 0,1 and 2.
Zone 0 is the area inside the bath.
Zone 1 is the zone 0 area plus the space up to 2,25 m above the floor.
Zone 2 is the zone 1 area extended by 0,6 m, again up to 2,25 m above the floor.
Zone 3 is the area reaching 2,4 m beyond zone 2, up to 2,25 cm above the floor.
2,4
m
2,4
m
Zone 1
Zone 1
Zone 0
Zone 3
Zone 3
Zone 3
Zone
2
Zone
2
2,25
m
0,6 m
0,6 m
0,2
m
Location of protection zones
~
(30 mA cut-off value)
230 V electric connection
with 4,5 kW efficiency protected
by a circuit breaker switch
Water connection 1/2”
for filling and draining
the bath.
Marina SPA connections
Summary of Contents for SPA Marina
Page 1: ...SPA Bath Marina 188 x 133 Installation and user manual ...
Page 22: ...22 ...