Page
14 of 25
POP-UP PUSH 8 ECO
Operator’s Safety and Maintenance Handbook ( rev.0.0.1.0210)
Section 4
OPERATING INSTRUCTIONS
turning clockwise.
4. Also ensure that the plunger valve is reset before operating, see instructions for
plunger valve resetting.
Emergency plunger valve
The plunger valve must be reset to enable the machine to operate correctly. To
reset the valve firstly ensure Valve’B’ has been fully closed. Depress the raise
button on the pendant control and raise the platform until the maintenance stands
can be deployed. Once the stands have been deployed simply pull Plunger
‘A’ and turn through 90 degrees. Push the plunger back into the slot as
shown left.
Depress the raise button once again and reset the maintenance stands. The
machine is now able to operate correctly.
Battery charging
A battery condition meter is fitted to the
POP-UP PUSH 8 ECO
as shown.
To accurately check the battery condition, a load must be applied across
the battery, elevating the machine from ground level will achieve this. Stand
away from the machine with the control pendant and press the UP button
whilst observing the bars on the metre. This metre displays the amount
of charge in the battery. All bars illuminated shows that the battery is fully
charged.
If less than four bars are on the display, the battery requires charging.
The
POP-UP PUSH 8 ECO
is supplied with a dedicated battery charger,
which is separate to the machine. Do not use any other type of battery
charger to charge your
POP-UP PUSH 8 ECO
machine.
To charge the battery, follow these steps:
1. Turn the power selector switch to ‘0’ (OFF) position.
2. Connect either the 240V or 110V lead (depending on mains supply) to the
POP-UP PUSH 8 ECO
at the point shown.