Page
15 of 25
POP-UP PUSH 8 ECO
Operator’s Safety and Maintenance Handbook ( rev.0.0.1.0210)
Section 5
MAINTENANCE
3. Connect the mains lead to a suitable power supply (either 110V or 240V)
4. Turn the power selector to ‘2’ (CHARGE) position and leave the charger to complete
the charging cycle. It will shut off automatically once finished. The battery should
be fully recharged after a period of 12 hours, which is indicated by the 95% light
illuminating on the battery charging indicator panel as shown.
Safety during maintenance
When performing maintenance on the
POP-UP PUSH 8 ECO
with the platform elevated, always ensure that the
maintenance props are engaged as shown.
WARNING
FAILURE TO ENGAGE THE MAINTENANCE PROPS MAY RESULT
IN THE PLATFORM LOWERING WITHOUT WARNING
Periodical maintenance and checks
The following checks should be undertaken at the recommended intervals shown:
Daily/Pre-use
Monthly
6 Monthly
12 Monthly
Inspect structure
•
•
•
•
Inspect platform
•
•
•
•
Check castors
•
•
•
•
Check manual rear brakes function
•
•
•
•
Check auto brakes function
•
•
•
•
Inspect for oil leaks
•
•
•
•
Check battery condition
•
•
•
•
Check raise/lower functions
•
•
•
•
Check emergency stop
•
•
•
•
Check emergency lower
•
•
•
•
Check stabilisers and lights function
•
•
•
•
Inspect training card and safety decals
•
•
•
•
Check hydraulic oil level
•
•
•
Inspect limit switches
•
•
•
Inspect wiring
•
•
•
Check electrical connectors
•
•
•
Lubricate roller guides
•
•
•
Lubricate grease nipples
•
•
•
Lubricate pivot pins
•
•
Lubricate castor mounts
•
•
Replace hydraulic oil
•