Safe Operating Procedure Guide
THIS DOCUMENT IS UNCONTROLLED WHEN PRINTED
Page
18
of
22
3.8.
Site operations
Step Instruction
Diagram
1.
Once all the PB units are setup, tested and
ready for operation, position yourself in a
safe area that will allow you to operate the
PB units ensuring you adhere to all line of
site and operational distances and radius.
2.
When a single operator is operating multiple
PB units, the PB units must be labelled with
the supplied magnets.
The magnets are numbered to correspond
with the respective remote control.
Operators must ensure they use remote
control caddy at all times ensuring the
remote controls are labelled the same as the
PB unit magnets.
3.
Ensure operators are positioned in a safe
zone off the road / away from vehicle or
plant movement paths.
Operators should be positioned no further
than 75m from the PB unit.
Ensure operators have clear line of site (at
least 120m visual on approach) for any PB
units in operation.
The traffic light accessory is synchronised
with the operation of the boom arm.
Standing in the safe zone, the operator
activates the controller to stop the traffic.
The traffic light changes from green to amber
to red, after approximately 3 seconds the
boom arm lowers securing the work zone
and providing a physical barrier.