Safe Operating Procedure Guide
THIS DOCUMENT IS UNCONTROLLED WHEN PRINTED
Page
20
of
22
3.9.
Contingency planning
Step Instruction
Diagram
1.
If a PORTABOOM® Tower fails ensure you are
prepared to:
-
manually operate the failed Tower and
operate the “other” Tower by using the
remote control.
OR
-
perform STOP/SLOW in place of the
failed Tower and
operate the “other”
Tower by using the remote control.