Safe Operating Procedure Guide
THIS DOCUMENT IS UNCONTROLLED WHEN PRINTED
Page
8
of
22
Step Instruction
Diagram
3.
If the PB unit is fitted with all-terrain wheels,
shift the spring loaded locking pins into the
locking position for both wheels.
4.
The carry bag contains:
-
Boom arm
-
Remote controls x2
-
Sandbag hooks x4
-
Magnet x1
-
Charging cable x1
-
Keys for access panel x2
Remove the boom arm from the carry bag.
5.
Using the access panel key provided, align
the cut out on the key with the red dot on
the lock and open up the small compartment
panel.
Note
: If the cut out on the key isn’t lined up
with the red dot on the lock you will not be
able to open the panel.
6.
Turn the PB unit on, once the self-testing
cycle is complete, the power light will
illuminate green indicating that it is ready.
Ensure green lights are on and in the raised
position, refer to the sticker on the unit.