16
PFM-4000
Part Number 6Z8303
Installation and Setup
Connecting the Electrical Power
The power requirement to operate the PFM-4000 Flange Machine is single phase,
220 VAC with a minimum current load of 15 amps. To connect, plug the machine
receptacle into the electrical outlet. The flange machine does not require any
warm-up time.
Checking the Electrical Connection
Perform an electrical power check after machine installation.
Use the following steps to perform the electrical power check:
1
Ensure that the flange machine is properly grounded.
2
Ensure that the flange machine is completely assembled and that the power
cord is undamaged and is free from obstruction.
3
Ensure the red OFF button located on the left side of the machine is in the
OFF position.
4
Plug the machine receptacle into the outlet.
5
Press the black ON button located on the left side of the sewing table.
WARNING:
Only qualified electrical personnel should perform
grounding procedures. Be careful when installing ground
connections. Failure to install connections correctly can
cause serious injury or death.
IMPORTANT!
Porter International, Inc. assumes no responsibility for
damages or injuries related to improper wiring of the
electrical source or wiring and grounding performed by
unauthorized personnel.
WARNING:
Only trained and authorized personnel may install the
flange machine and check electrical connection and
grounding. The machine contains high voltages that can
cause serious injury or death.
CAUTION:
Before activating the machine, be sure no tools or other
unnecessary objects are on the sewing table, and that the
work area is free of debris.