18
Manual: NGP-1000D-M1/M2/M3
6.
The membrane pressure gauge should read between 85 and
105 PSI. See Figure 19.
7.
Record the time it takes for the nitrogen storage tank to
reach 75 PSI. It should typically take 20 minutes for the
NGP-1000D-M1, 14 minutes for the NGP-1000D-M2, and 8
minutes for the NGP-1000D-M3.
NOTE:
The air compressor will cycle on and off during this
process.
5.
Open the petcock on the nitrogen storage tank (bottom tank)
and relieve the pressure until the Nitrogen Solenoid light
turns ON. See Figure 18. The Nitrogen Solenoid light should
turn on at 60±3 PSI on the nitrogen tank pressure gauge.
Figure 18
Figure 19
Nitrogen Storage Tank Petcock
firealarmresources.com