3. Commissioning - Page 19
The Puma combination boiler has been through a rigorous
test procedure after manufacture and should not require
any further adjustment. If in the unlikely event of the
appliance not operating correctly please turn to the Control
Flow, Functional Flow and Fault Finding charts that start on
page 42.
3.1
Electrical Installation
Conduct a preliminary electrical test by checking: for short
circuits, fuse failure, incorrect polarity, earth continuity and
resistance to earth. If a fault has occurred on the appliance,
the fault finding procedure should be followed. See pages
39 & 48.
3.2
Gas Installation
The whole of the gas installation including the meter,
should be inspected and tested for soundness and purged
in accordance with the recommendations of BS 6891.
Purging air from the gas line may be carried out by
loosening the union on the gas service cock and purging.
Re-tighten the union when completed and check for gas
soundness.
N.B.
Open all doors and windows, extinguish naked lights
and DO NOT SMOKE when carrying out the gas
soundness tests and purging.
Summary of Contents for 80e
Page 5: ...Optional Extras Page 5 ...
Page 6: ...Optional Extras Page 6 Installation instructions included as necessary with each kit ...
Page 7: ...Optional Extras Page 7 Installation instructions included as necessary with each kit ...
Page 12: ......
Page 28: ...Routine Maintenance Page 27 ...
Page 30: ...Routine Maintenance Page 29 ...
Page 34: ...Component Replacement Page 33 ...
Page 35: ...Component Replacement Page 34 ...
Page 43: ...7 1 Control Flow Sequence Permanent Pilot Page 42 ...
Page 44: ...7 2 Functional Flow Permanent Pilot Page 43 ...
Page 45: ...7 3 Fault Finding Permanent Pilot Page 44 ...
Page 46: ...7 4 Electrical Diagram Permanent Pilot Page 45 ...
Page 47: ...8 1 Control Flow Sequence Electronic Page 46 ...
Page 48: ...8 2 Functional Flow Electronic Page 47 ...
Page 49: ...8 3 Fault Finding Electronic Page 48 ...
Page 50: ...8 4 Electrical Diagram Electronic Page 49 ...