6.5.4 Circulating pumps
The permissible current load per pump output is I
N max
= 1A.
6.5.5 Appliance fuses
Appliance fuse in the control unit ISR:
Mains fuses: T 6.3A H 250V
6.5.6 Connect sensor / components
Danger
Risk of electric shock! Danger to life through incorrect work!
The wiring diagram must be followed! Optional accessories must
be fitted and connected according to the instructions provided.
Connect to the mains. Check earthing.
Outdoor temperature sensor (included in delivery)
The outdoor temperature sensor is located in the accessory bag. For con
nection see wiring plan.
6.5.7 Replacing cables
All connecting cables, except for the mains connection cable, have to be
replaced by Potterton special cables in case of replacement. When replac
ing the mains connection cable, only cables of the types H05VV-F 3 x 1
mm
2
or 3 x 1.5 mm
2
may be used.
6.5.8 Protection against contact
After the EC four has been opened, the cladding parts to be screwed on
should be screwed back on with the appropriate screws to ensure protec
tion against contact.
6.6 Filling the system
1. Fill the heating system using the boiler fill and drain valve (BFD
valve) of the EC four
2. Check the system for leaks (max. water test pressure: 6 bar)
For more information, see
Boiler, page 20
Fig.27 Strain reliefs
1
2
3
4
RA-0000064
6 Installation
50
7636047 - 02 - 24082015
Summary of Contents for eurocondense four 125 kw
Page 19: ...3 2 6 Wiring diagram Fig 3 Wiring diagram 3 Technical specifications 7636047 02 24082015 19 ...
Page 40: ...Fig 22 Legend for application examples part 2 5 Before installation 40 7636047 02 24082015 ...
Page 143: ...13 Appendix 13 1 Declaration of conformity 13 Appendix 7636047 02 24082015 143 ...
Page 146: ...Index 146 7636047 02 24082015 ...
Page 148: ...7636047 02 24082015 ...