5.6 Exhaust gas system
Paramount three
30/40
Paramount three
60
Paramount three
80
Paramount three
95
Paramount three
115
Flue
Type
Flue
Size
Max.
Flue
Length*
Max
No. of
bends
(87
0
)
Flue
Size
Max.
Flue
Length*
Max
No. of
bends
(87
0
)
Flue
Size
Max.
Flue
Length*
Max
No. of
bends
(87
0
)
Flue
Size
Max.
Flue
Length*
Max
No. of
bends
(87
0
)
Flue
Size
Max.
Flue
Length*
Max
No. of
bends
(87
0
)
C13
(Horizontal Concentric)
80 /
125
10
2
100 /
150
5
2
100 /
150
5
2
100 /
150
5
2
100 /
150
5
2
C33(1)
(Concentric Vertical)
80 /
125
13
0
100 /
150
22
0
100 /
150
13
0
100 /
150
10
0
100 /
150
10
0
C33(2)
(Concentric Vertical)
80 /
125
15(3)
2
100 /
150
24(3)
2
100 /
150
15(3)
2
100 /
150
18(3)
2
100 /
150
20(3)
2
C33(3)
(Concentric Vertical)
80 /
125
13(3)
2
100 /
150
13(2)
2
100 /
150
9(3)
2
100 /
150
9(2)
2
100 /
150
8(2)
2
B23
(Conventional Flue)
80
20(3)
3
110
25(3)
3
110
16(3)
3
110
20(3)
2
110
20(3)
2
5.7.1 Contaminated chimneys
Combustion of solid and liquid fuels generates deposits and pollution in the perti-
nent flue gas tract. Cleaning and user maintenance must not be carried out by chil-
dren without supervision. Such flue gas tracts are not suitable for combustion air
supply of heat generators without pretreatment. Contaminated combustion air is
one of the main causes of corrosion damage and malfuctions on fuel-burning in-
stallations. If the combustion air has to be drawn via an already existing chimney,
this flue gas tract should be inspected by the competent district chimney sweep
officer and if necessary cleaned. Should structural deficiencies (e. g. old, broken
chimney structures) conflict with its use as combustion air supply duct, suitable
measures such as shake-out of the fireplace should be taken. It must be ensured
that there is no contamination of the combustion air with foreign matter.
In case an appropriate clean up of the existing flue gas tract is not possible, the
heat generator can be operated on a concentric flue gas pipe independent of venti-
lation. The concentric exhaust gas pipe must run straight in the duct.
5.7.2 Lightning protection
Danger of electric shock! Danger of life by lightning!
The chimney head cover must be integrated in a possibly existing lightning protec-
tion system and house-side potential equalisation.
This work should be carried out by a approved concern specializing in lightning
protection and electrical work.
5.7.3 Duct requirements
Inside buildings, exhaust gas system should be laid in suitable ventilated ducts.
The ducts must be made of non-combustible, dimensionally stable materials.
Fire resistance duration of the shaft: 90 min.
Fire resistance duration of the shaft in case of buildings of lower building height:
30 min.
Installation
30
Paramount three 30-115 kW
7308272-03 03.14
Summary of Contents for Paramount 40
Page 1: ...Installation manual Gas condensing boiler Paramount three 30 115 kW ...
Page 23: ...Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 23 ...
Page 25: ...Fig 5 Connection plan Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 25 ...
Page 28: ...4 9 Legend Prior to installation 28 Paramount three 30 115 kW 7308272 03 03 14 ...