Tab. 6: Guide Values for injector pressure (full load)
Model
Paramount
Three 60
Paramount
Three 80
Paramount
Three 95
Paramount
Three 115
Nominal heat load
Heating
kW 12,0-50,0
17,0-70,0
20,0-90,0
25,0-110,0
Nominal heat output
80/60°C
kW 11,5-48,5
16,4-67,9
19,4-87,3
24,3-106,8
50/30°C
kW 12,8-51,9
18,3-72,5
21,4-93,1
26,7-113,5
Injector diameter for
Natural Gas LL (G25)
mm
7,80
9,30
9,30
11,40
Natural Gas E (G20)
mm
7,20
8.50
8.50
10.30
LPG (propane)
mm
5,80
7,00
6,50
7,40
Guide values for injector pressure
*
Natural Gas LL (12,4)
**
mbar
6,3-7,3
8,3-8,9
12,5-13,5
12.0-13.0
Natural Gas E (15,0)**
mbar
6,3-7,3
8,0-8,6
12,5-13,5
12.0-13.0
Propane
mbar
6,3-7,3
7,9-8,5
14,5-15,5
14,5-15,5
the CO
2
-content should be
- between 8.3% and 8.8% for natural gas
- for liquid gas be between 10,3% and 10,8%
* at pressure at end of boiler 0 mbar, 1013 hPa, 15 °C
** values in brackets = Wobbe Index W
oN
in kWh/m
3
Tab. 7: Guide Values for the gas flow rate for natural gas
Model
Paramount
Three 60
Paramount
Three 80
Paramount
Three 95
Paramount
Three 115
Nominal heat load
(full load)
kW
50,0
70,0
90,0
110,0
Gas Flow Rate in l/min
7
119
167
214
262
7.5
111
156
200
244
8,0
104
146
188
229
Operating heating value
8.5
98
137
176
216
H
uB
in kWh/m
3
9,0
93
130
167
204
9,5
88
123
158
193
10
83
117
150
183
10,5
79
111
143
175
11
76
106
136
167
11,5
72
101
130
159
5.19 Electrical connection
(general)
Risk of electric shock!
All electrical work in connection with the installation must
only be carried out by a qualified electrician!
- Mains supply AC 230 V +6% -10%, 50 Hz
The boiler must be installed on an uninterrupted supply with the correct polarity.
For the power supply, use the power cable attached to the boiler or cable types F 3
x 1 mm
2
or 3 x 1.5 mm
2
.
We recommend the installation of a mains isolator upstream of the Paramount.
This should isolate all poles and provide contact separation of at least 3 mm.
Installation
36
Paramount three 30-115 kW
7308272-03 03.14
Summary of Contents for Paramount 40
Page 1: ...Installation manual Gas condensing boiler Paramount three 30 115 kW ...
Page 23: ...Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 23 ...
Page 25: ...Fig 5 Connection plan Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 25 ...
Page 28: ...4 9 Legend Prior to installation 28 Paramount three 30 115 kW 7308272 03 03 14 ...