6.8 Guide for commissioning
Tab. 8: Guide for commissioning
1.
System location
2.
Customer
3.
Boiler type/Designation
4.
Serial number
5.
Characteristic gas values
Gas Type
..........................
6.
Natural Gas / LPG
kWh/m³
..........................
7.
Have all pipelines and connections been checked for tightness?
□
8.
Exhaust gas system checked?
□
9.
Gas pipeline checked and purged?
□
10. Static pressure measured at the gas valve inlet?
mbar ...............................
11. Free wheeling of pumps checked?
□
12. Filling the heating plant
□
13. Used water additives
...............................
14. Gas flow pressure measured at full load at the gas valve inlet?
mbar ...............................
15. Gas injector pressure measured at full load at the gas valve outlet?
mbar ...............................
16. CO
2
-content at low load
% ...............................
17. CO-content at low load
ppm ...............................
18. CO
2
-content at full load
% ...............................
19. CO-content at full load
ppm ...............................
20.
Function test:
Heating mode
□
21.
DHW operation
□
22.
Programming:
Time /date
□
23.
Comfort setpoint heating circuit 1/2
°C ...............................
24.
Setpoint DHW
°C ...............................
25.
Automatic day time programme
Clock ...............................
26.
Heating curve checked?
□
27. Tightness of the flue system checked in operation (e.g. CO
2
test in annular gap)?
28. Customer instructed?
□
29. Documents handed over?
□
Only components tested and marked according to he respective standard have been used.
To ensure the heat source operates reliably and economically for a long period,
we recommend annual maintenance for the heat source.
Date /signature
Company stamp
...............................
Commissioning
42
Paramount three 30-115 kW
7308272-03 03.14
Summary of Contents for Paramount 40
Page 1: ...Installation manual Gas condensing boiler Paramount three 30 115 kW ...
Page 23: ...Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 23 ...
Page 25: ...Fig 5 Connection plan Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 25 ...
Page 28: ...4 9 Legend Prior to installation 28 Paramount three 30 115 kW 7308272 03 03 14 ...