Function
Prog.
no.
Level
1)
Standard value
Operation HC2
Commonly with HC1 | Independently
44
C
Commonly with HC1
Operation HC3/P
Commonly with HC1 | Independently
46
C
Commonly with HC1
Room temperature Unit 1
Only for Heating circuit 1 | For all assigned heating circuits
This parameter is only visible in the room device!
47
C
For all assigned heating
circuits
Presence key device 1
None | Only for Heating circuit 1 | For all assigned heating circuits
This parameter is only visible in the room device!
48
C
For all assigned heating
circuits
Readjustment room sensor
This parameter is only visible in the room device!
54
E
0.0°C
Software version
70
E
-
Radio
Parameter only visible, if wireless room device exists!
Room unit 1
Missing | Ready | No reception | Change battery | Delete device
130
C
missing
Room device 2
Missing | Ready | No reception | Change battery | Delete device
131
C
missing
Room unit 3
Missing | Ready | No reception | Change battery | Delete device
132
C
missing
Outside sensor
Missing | Ready | No reception | Change battery | Delete device
133
C
missing
Repeater
Missing | Ready | No reception | Change battery | Delete device
134
C
missing
Operator unit 1
Missing | Ready | No reception | Change battery | Delete device
135
C
missing
Operator unit 2
Missing | Ready | No reception | Change battery | Delete device
136
C
missing
Operator unit 3
Missing | Ready | No reception | Change battery | Delete device
137
C
missing
Service unit
Missing | Ready | No reception | Change battery | Delete device
138
C
missing
Delete all devices
No | Yes
140
C
No
Time prog heating circuit 1
Preselection Mo - Su
Mo-Su | Mo-Fr | Sa-Su | Mo | Tu | We | Th | Fr | Sa | Su
500
Eu
Mo
1st phase on
501
Eu
06:00 (h/min)
1st phase off
502
Eu
22:00 (h/min)
2nd phase on
503
Eu
--:-- (h/min)
2nd phase off
504
Eu
--:-- (h/min)
3rd phase on
505
Eu
--:-- (h/min)
3rd phase off
506
Eu
--:-- (h/min)
Copy?
515
Eu
Programming
52
Paramount three 30-115 kW
7308272-03 03.14
Summary of Contents for Paramount 40
Page 1: ...Installation manual Gas condensing boiler Paramount three 30 115 kW ...
Page 23: ...Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 23 ...
Page 25: ...Fig 5 Connection plan Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 25 ...
Page 28: ...4 9 Legend Prior to installation 28 Paramount three 30 115 kW 7308272 03 03 14 ...