6. Screw the lifting rings into the locations provided. Tightening torque:
23 N.m.
Important
The rings are supplied with the boiler.
7. Remove the screws attaching the boiler to the pallet.
8. Use carrying bars or slings (not provided) to move the boiler.
Sling attachment angle
β < 60°
SIRIUS THREE FS 130
126 kg
SIRIUS THREE FS 150
132 kg
Caution
Moving the boiler is a job for two people.
Follow the usual handling techniques and use adequate safety
equipment.
9. Close the boiler.
(1)
Adjustment range for the feet: 30 mm
10. Level the boiler using the adjustable feet.
Fig.33
6
MW-2000780-1
7
7
Fig.34
>100 kg
MW-2000781-1
8
8
8
Fig.35
10
MW-2000782-2
(1)
5 Before installation
7702639 - v03 - 10072018
37