7. Screw the lifting rings into the locations provided. Tightening torque:
23 N.m.
Important
The rings are supplied with the boiler.
8. Remove the screws attaching the boiler to the pallet.
9. Use slings (not provided) to move the boiler.
Sling attachment angle
β < 60°
SIRIUS THREE FS 200
212 kg
SIRIUS THREE FS 250
232 kg
Caution
Moving the boiler is a job for two people.
Follow the usual handling techniques and use adequate safety
equipment.
10. Close the boiler.
Fig.50
8
8
8
8
MW-4000298-1
7
Fig.51
MW-4000299-1
>200 kg
9
5 Before installation
44
7702639 - v03 - 10072018