GENERAL PRECAUTIONS
This boiler has been designed to heat water to a temperature lower than boiling point at atmospheric pressure. It must be
connected to a central heating system and to a domestic hot water supply system according to its performance and power output.
Before having the boiler installed by a qualified service engineer, make sure the following operations are performed:
•
Make sure that the boiler is adjusted to use the type of gas delivered by the gas supply. To do this, check the markings on the
packaging and the data label on the appliance.
•
Make sure that the flue terminal draft is appropriate, that the terminal is not obstructed and that no exhaust gases from other
appliances are expelled through the same flue duct, unless the latter has been specially designed to collect exhaust gas from
more than one appliance, in compliance with current laws and regulations.
•
Make sure that, if the boiler is connected to existing flue ducts, these have been thoroughly cleaned as residual products of
combustion may detach from the walls during operation and obstruct the flow of fumes.
•
To ensure correct operation and maintain the warranty, observe the following precautions:
1. DHW circuit
1.1
If the water is harder than 20 °F (1 °F = 10 mg calcium carbonate per litre of water), install a polyphosphate dispenser or an
equivalent treatment system, compliant with current regulations.
1.2
Thoroughly flush the system after installation of the appliance and before use.
1.3
The materials used for the DHW circuit comply with Directive 98/83/EC.
2. Heating circuit
2.1 New system:
Before installing the boiler, the system must be cleaned and flushed to eliminate residual thread-cutting swarf,
solder and any solvents, using suitable off-the-shelf non-acid and non-alkaline products that do not damage metal, plastic and
rubber parts. To protect the system from scale, use inhibitors such as SENTINEL X100 and FERNOX protector for heating circuits.
Use these products in strict compliance with the manufacturers' instructions.
2.2 Existing system:
Before installing the boiler, drain the system and clean it to remove sludge and contaminants, using suitable
proprietary products. Recommended cleaning products are: SENTINEL X300 or X400 and FERNOX regenerator for heating
circuits. Use these products in strict compliance with the manufacturers' instructions. Remember that the presence of foreign
bodies in the heating system can adversely affect boiler operation (e.g. overheating and excessive noise of the heat exchanger).
Initial lighting of the boiler must be carried out by an authorised Service Engineer who must first ensure that:
•
The rated data correspond to the supply (electricity, water and gas) data.
•
That the installation complies with current regulations.
•
The appliance is correctly connected to the power supply and earthed.
The appliance must be installed in a ventilated boiler room pursuant to current regulations (appliances with heating capacity
> 40 kW).
Failure to observe the above will render the warranty null and void. Prior to commissioning, remove the protective plastic
coating from the boiler. Do not use any tools or abrasive detergents to do this as you may damage the painted surfaces.
Do not leave any packaging (plastic bags, polystyrene, etc.) within the reach of children as they are a potential source of danger.
Summary of Contents for Sirius Three WH-130
Page 1: ...May 2018 Sirius three WH 130 150 kW ...
Page 10: ...7704679 01 3 08 18 10 583 892 600 G 1 1 2 G 1 1 2 G 1 198 100 100 100 102 CR_0775 95 223 24 ...
Page 20: ...7704679 01 3 08 18 20 WEATHER COMPENSATION CURVE GRAPHS QAC34 ...
Page 35: ...35 7704679 01 3 08 18 29 DIAGRAMS AGU 2 550 CR_0349 CR_0349 AVS 75 bis ...
Page 36: ...7704679 01 3 08 18 36 CG_2482 SAFETY THERMOSTAT Tmax 50 C free contact ...
Page 37: ...37 7704679 01 3 08 18 MODIFIED PARAMETERS Nr VALUE NOTE ...
Page 38: ...7704679 01 3 08 18 38 ...
Page 39: ...39 7704679 01 3 08 18 ...