3. Commissioning - Page 21
Circuit
Board
Optional
Programmer
Terminal
Connection
Cable Clamps
Viewing
Window
Electrode
S
U
P
0
0
0
4
A
Air
Pressure
Switch
Flue
Elbow
Flow
Return
Rear Case
Mounting
Bracket
Flue Hood
Fan
Temperature
Sensor
Overheat
Thermostat
Heat
Exchanger
Heat
Exchanger
Suppor t
Bracket
Heat
Exchanger
Drain Point
Burner
Side
Insulation
Front
Insulation
Front
Case
Temperature
Data
Badge
Temperature
Control
Reset
Button
L.E.D.
(Green)
L.E.D.
(Red)
R e s e t
M a x
0
Gas
Valve
Inlet
Pressure
Test Point
Injector
Manifold
Burner
Pressure
Test Point
Gas
Pressure
Adjuster
Electrical
Connector
Closed
Open
Gas Valve
Gas Valve
Bar
Code
Boiler
Code No.
Model
G.C. No.
50
AHHP 601 0001
Input Q =
(Gross)
Output P =
Gas Rate
Burner
Pressure
(Hot)
Cat.
C o u n t r y o f D e s t i n a t i o n : G B , I E .
kw
kw
mbar
NG - 20 mbar
Type - C & C
12
32
2H
18.3
14.7
1.75
10.3
14.8
11.4
1.42
6.7
PMS = 3.0bar
G . C . N o . 4 1 . 6 0 7 . 7 7
8
7
/
A
R
/
X
X
X
X
IP20
Btu/ h
Btu/ h
f t ³ / h
m ³ / h
in.wg
Potterton Myson Ltd
503189 ISS.01
62500
50000
61.8
4.10
50500
39000
50.1
2.65
96
Injector Size
3.5mm dia
THIS APPLIANCE IS INTENDED
EXCLUSIVELY TO BE INSTALLED ON A
GAS SUPPLY WITH A GOVERNED METER.
230V 50H
80W
3A Fuse
Z
Important
The commissioning and boiler adjustment must
only be carried out by a suitably qualified
personnel. Potterton Myson Ltd. Offer this
service on a chargeable basis.
Important
When checking for gas soundness open
all windows and doors in the room.
Extinguish all naked lights, cigarettes, pipes, etc
.
Summary of Contents for Suprima 30
Page 6: ...Installation Requirements Page 6 ...
Page 10: ...Installation Requirements Page 10 Fig 3 Fig 4 ...
Page 12: ...Flue Kits Page 12 ...
Page 13: ...Optional Extras Flues Page 13 Installation instructions included as necessary with each kit ...
Page 14: ...System and Other Kits Page 14 ...
Page 15: ...System and other Kits Page 15 ...
Page 33: ...6 Wiring Diagram Page 33 ...