Date: Oct.24, 2012
Page
5
of
6
Rev.
12. Attach Bottom Frame (E) to Headboard (B) and Footboard (A).
13. Secure using 4pcs of Short Hex Bolt 1/4
” x 32mm (K), 4pcs of Spring Washer (N), 4pcs of Flat Washer (O),
and tighten with Allen Key (T).
14. Adjust Leveler (S) to be flush with the floor.
15. Fully tighten all bolts at this step to secure the construction.
16. Put the drawer boxes back to the Bottom Frame (E) by aligning the wooden runners. Make sure the drawer
fits properly.