background image

Date: 2014-Oct-22 
Rev: 2014-Dec.-25                                                               

   

  

 

 

 

 

 

 

 

 

 

Page 8 of 12 

  

 
 

8.  Attach (K) to (E) by aligning pre-drill holes with wooden dowels as shown below. 

Do not over tighten.

   

             

9.  Assemble (M) to (E) by aligning pre-drill holes with wooden dowels as shown below. 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
10.  Attach (F) to (I) by aligning pre-drill holes with wooden dowels as shown below. 

Do not over tighten.

 

 

11.  Secure (F) to (D) as shown below. 

Do not over tighten.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

1x 

1x 

1x 

3x 

Summary of Contents for GEMMA CRIB

Page 1: ...Date 2014 Oct 22 Rev 2014 Dec 25 Page 1 of 12 pottery barn kids GEMMA CRIB www potterybarnkids com...

Page 2: ...suffocate on soft bedding Never add a pillow or comforter Never place additional padding under an infant To reduce the risk of SIDS pediatricians recommend healthy infants be placed on their backs to...

Page 3: ...al integrity of the item Do not remove warning labels from the crib Labels are permanent and not designed to be removed PRE ASSEMBLY Remove all parts and hardware from the box and place them on a carp...

Page 4: ...ight 1x E Bottom Panel 1x F Bottom Frame 1x G Back Panel 1x H Mattress Base 1x I Vertical Support 1x J Small Tilt rail 2x L Drawer 2x M Middle Support 1x K Big Tilt rail 1x HARDWARE INCLUDED N Bolt M6...

Page 5: ...ge 5 of 12 ASSEMBLY INSTRUCTIONS 1 Attach J to E by aligning pre drill holes with wooden dowels as shown below Do not over tighten 2 Attach G to A by aligning pre drill holes with wooden dowels as sho...

Page 6: ...age 6 of 12 3 Attach E to A by aligning pre drill holes with wooden dowels as shown below Do not over tighten 4 Attach D to assembly Step 3 by aligning pre drill holes with wooden dowels as shown belo...

Page 7: ...age 7 of 12 5 Attach B to E by aligning pre drill holes with wooden dowels as shown below Do not over tighten 6 Secure B to D using P as shown below Do not over tighten 7 Attach I to B as shown below...

Page 8: ...n dowels as shown below Do not over tighten 9 Assemble M to E by aligning pre drill holes with wooden dowels as shown below 10 Attach F to I by aligning pre drill holes with wooden dowels as shown bel...

Page 9: ...Date 2014 Oct 22 Rev 2014 Dec 25 Page 9 of 12 12 Attach C to assembly Step 11 as shown below Do not over tighten 13 Rotate the crib as shown below and secure A to C using P F 1x 1x 1x 6x 7X 2X 1X...

Page 10: ...Dec 25 Page 10 of 12 14 With the help of another adult carefully turn the Crib upright as shown below 15 Attach Q R to H using N Make sure the brackets point outwards as shown below 16 Attach S to N u...

Page 11: ...hich height they want it installed 17 Determine the desired height of the Mattress Base H With the help of an adult place the Mattress Base H into the crib Be careful not to scratch the finish Attach...

Page 12: ...ately and wipe with a clean damp cloth We do not recommend the use of chemical cleansers abrasives or furniture polish on our lacquered finish If the crib is to be stored store in cool dry place and c...

Reviews: