Date: 2016-Agust.-02
Rev:
Page 4 of 8
F
L
D
E
D
L
Z
H
G
2. Assembly the Bottom Rails (F) to the base panels(D&E), by aligning the preinstalled wooden dowels to the
predrilled holes. Secure with 12 pcs Screws (L) and tighten with Philips Head Screwdriver as shown below.
2.
3. Assembly the Castors (H) to base panels as shown below. Secure with 4 pcs Screws (G) as shown below.
3.