background image

Date: 2014-Nov.-18    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    Page 5 of 6 

Rev:

 

 

4. 

Repeat the same procedure in Step #3  to  attach  the other  Upper Side Rail (D)  to the assembled piece,  as 
shown in the illustration below.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5. 

Attach  (2x)  Guardrail  (C)  to the assembled frame  by aligning wooden  dowels on the guardrails  to pre-drilled 
holes on the Front Gate Panel and Back Panel. Secure the Guardrail © using 4 sets of: Spring Washer (I), Flat 
Washer (J), Half-Moon Metal Block (K) and Bolt (H), as shown in the illustration below. Tighten by Allen Key (G). 
Do not fully tighten the bolts.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

H

I

J

K

G

4X 

 

  

 

  

 

 

 

 

 

 

    

   

  

 

 

  

  

  

 

 

  

 

 

    

  

 

  

 

 

    

    

 

 

    

 

 

 

  

  

  

  

  

    

 

      

    

 

      

    

 

 

 

  

 

(H

) Bolt 4x

 

 

(I) Spring Washer 4x 

 

(J) Flat Washer 4x 

 

  

 

  

 

 

 

 

 

 

    

 

 

 

    

   

 

  

  

  

  

  

  

 

 

    

 

    

 

 

 

    

   

  

    

 

 

 

   

    

 

 

 

   

    

 

    

 

 

  

 

  

    

 

  

  

 

   

 

    

 

    

 

 

 

  

 

    

 

  

 

 

  

 

(K) Half-Moon Metal Block 4x 

 

  

 

  

 

 

 

 

 

 

    

   

  

 

 

  

  

  

 

 

  

 

 

    

  

 

  

 

 

    

    

 

 

    

 

 

 

  

  

  

  

  

    

 

      

    

 

      

    

 

 

 

  

 

(H

) Bolt 4x

 

 

(I) Spring Washer 4x 

 

(J) Flat Washer 4x 

 

  

 

  

 

 

 

 

 

 

    

 

 

 

    

   

 

  

  

  

  

  

  

 

 

    

 

    

 

 

 

    

   

  

    

 

 

 

   

    

 

 

 

   

    

 

    

 

 

  

 

  

    

 

  

  

 

   

 

    

 

    

 

 

 

  

 

    

 

  

 

 

  

 

(K) Half-Moon Metal Block 4x 

C

H

I

J

K

G

4X 

Reviews: