Date: 6‐Feb‐15
www. potterybarnkids.com
Page 9 of 12
Rev:
*Note: The mattress base (C) may be at the highest level (Level 2) when the child is
born. It must be at the lowest level (Level 1) before the child can stand up. Before
installing the mattress base (C), please ask the customer at which height they want it
installed (Illustration showing Mattress base install in the highest position).
3. After determining the desired height of the mattress base (C). With the help of an
adult, place the Mattress Base (C) into the crib by carefully not to scratch the finish.
Attach (C) to (A) as shown below. Do not fully tighten (
I
) at this time.
*
Note:
To change the position of the Mattress Base (C), remove bolts (
I
), line up the
Mattress Base (C) with the holes at the desired height (Level 1 or 2) and re-attach the
Mattress Base (C) with bolts (
I
).
(
I
) Bolt- M6x27mm - 4x
Installed in the highest position.
4x
C
A
A
I
K
Level 2
Level 1
C
4
x