k. Assemble grommets in the aisle roof sections.
l. Assemble and wire the light switches, receptacles, lamp sockets, etc. in accordance with the
wiring diagrams furnished for the switchgear.
Figure 13 Assembly of Outdoor Switchgear with Protected Aisle
1-1/2" PRESTITE
GASKET
H
A
BB
J
D
L
B
AISLE END
WALL
1-1/2" PRESTITE
GASKET
FLOOR CAP
FLOOR
TIE PLATE
C
E
F
G
DD
N
(TYPICAL)
ROOF ANGLE
REUSE
HARDWARE
1-1/2" PRESTITE
GASKET
METAL CLAD
EQUIPMENT
PROTECTED
AISLE FLOOR
AISLE END
EXTENSION
M
R
P
FF
EE
CC
ROOF CAP
REUSE HARDWARE
FROM FIG.3
LIFTING EYE
CHANNEL
END CAP
CAP
BUSHING
ROOF
END CAP
AISLE ROOF
ROOFSECTION
WITH FILTER
FOR AISLE END
WALL DESIGN
ROOF
CORNER CAP
AISLE END
EXTENSION
PLUG BUTTONS
FOR AISLE END
WALL DESIGN.
REUSE FROM
FIG. 3
AISLE ROOF