Reference: 38741
Issue date: 2018-JUL-24
Revision: L
Page 23 of 37
6. Operation of the Blade Access Platform
The 2 Titan hoists on the BAP platform are controlled from the Central Control Box (CCB).
Pic 1 Selector switch for pendant control
Pic 2
Make Sure that all the plug connection are made and closed properly. Connect the power
control Plug.
To operate the platform upwards, press the UP button. Both Titan hoists will start
simultaneously. Buttons are of the dead man type. See Picture 1
To operate the platform down, press the down button.
In Case of Emergency, the Emergency stop, will cut the power to the hoists.
The control Box is provided with an automatic Levelling device, becoming active
when the inclination exceeds 6°. The system will cut the up-direction of the highest
hoist and the down direction of the lowest hoist, allowing only those movements to
correct the level.