CF(M)-3K-12 SUPERCOMBI USER’S GUIDE
23
power off. Under PV charging mode, the PV indicator will turn flashing green
(see Appendices). There are 3 working statuses as follow:
Under inverting condition: The solar and the battery will provide DC power
together for AC inverting, but the solar power will have the priority to
provide up to 500W energy for inverting.
Under AC Charging condition: The solar and the Grid will provide energy
for charging. The solar has the priority to provide up to 500W energy for
charging.
Under the Standby & Sleep mode: The solar will charge the battery
independently .
5.5 Auto Sleep
To further reduce the power consumption, the SuperCombi will enter into sleep
mode automatically when the standby mode last for 5 minutes. All the light of
the digital cube and LED will turn off. The panel can be woken up by pressing
any button. Under Sleep Mode, if PV panel is connected and the PV voltage
reaches the working threshold, the internal MPPT model of SuperCombi will
start to charge the battery without waking up the control panel screen. If the
MPPT model reaches temperature limit, the SuperComi will be waken up and
start to cool down the MPPT model.
5.6 Turn Off the Panel Manually
To avoid disturbing the users because of the light from the panel, the panel can
be turned off manually.
By pressing the PgDown button for 2 seconds, the customer can turn off all the
light.
To turn on the panel, pressing the Page Down button again.