String PV Grid-tied Inverter PSiO-W3#1100VPVK Series
(100000-125000)
User Manual
3 Installation
51
When connecting, pay attention to the limiting position, and don't wrongly insert it. When tightening,
do not use excessive force (torque: 1.5~2.0N•m), so as not to damage the interface.
The GPRS do not need to set.
For the use of WIFI and GPRS, please scan the QR code on the WIFI/GPRS.
3.6.8 COM. Communication Connection
COM. communication includes Ethernet communication and RS485 communication.
Step 1
Loosen the external forced cable fixing head of "COM.", and then lead the communication cable go
through the external forced cable fixing head.
Step 2
Connect the communication wire.
Ethernet communication connection
Crimp the Ethernet communication wire according to Figure3-45, and then plug it into the Ethernet
port on the communication board, as shown in Figure3-46. Connect the other end to the monitoring
platform or router.
Figure3-45
Diagram of crimping of Ethernet communication wire