Pg7
FOLDING RETRACTABLE STAIRWAY
To suit Hitachi EX3600 Excavator
EX3600-FRS 3-8-15
Section 2
Recommended Maintenance Procedure
Daily
Visually check stairway and structure for damage, loose components,
handrails, etc.
Check for hydraulic oil leaks from hydraulic cylinders, plumbing and hoses.
Notify the appropriate supervisor for any observed damage or malfunction.
500 Hours
Grease all grease nipples. Lower or raise stairway for accessibility.
Check main mounting bolts for torque.
Check hydraulic oil level in power pack and top up as necessary. (Stairway in raised
position).
Top up using same hydraulic oil as used in hydraulics of machine.
Thoroughly check all electrical wiring for damage, replace as necessary.
Repeat daily check as above.
5000 Hours
Change hydraulic oil in tank of hydraulic power pack (10.0 litres).
It is recommended that the same hydraulic oil be used in the power pack as the
hydraulics of the machine.
Grease all grease nipples. Lower or raise stairway for accessibility.
Retorque all main mounting bolts
Repeat daily check as above.