RCR w/Side Shift Installation
Installation of Carriage and Platform
1. Check the roller track (
A
, Figure 8) for proper
installation by concrete contractor according to
approved/certified pit drawings. Make sure roller
track is level, free from damage and clear of foreign
material. See Figure 9.
2. Remove any control panel, bumpers or palletizing
that may be banded to the dock leveler.
3. To separate RCR platform from the carriage,
support the platform on its back side (diamond plate)
and support the carriage, then:
a. Remove and cap any hydraulic hoses.
b. Remove (
B
) hoist cylinder pins at carriage.
c. Remove rear hinge pins (
C
, platform to
carriage). See Figure 12.
4. Make sure the mounting hardware of lifting
brackets (
D
) is snug. The brackets should pivot
without binding on the mounting cap screw.
5. With the carriage separated from the RCR
platform, the carriage must be oriented so that the
rollers will slide into the roller track when lifted.
6. Position the the carriage (
F
) so that it can slide
into the roller track (
A
) from the side. The carriage
must be installed slowly and as level as possible to
prevent damage to the rollers. See Figure 12 for view
of carriage installed into roller track.
7. Step 7 differs depending on RCR model:
Manual Side Shift models:
a. Weld on roller track stops (
K
, Figure 13) and
proceed to step 8.
Hydraulic Side Shift models:
a. Install side shift cylinder mount (
G
, see supplied
engineering drawings for exact mounting location).
Anchor to dock face or weld to embed.
b. Install side shift cylinder (
H
).
The dock leveler is heavy. Use a lifting device and
chains with the appropriate lifting capacity and
reach.
Always use the lifting brackets provided with the
unit whenever lowering or lifting a dock leveler.
A — Roller Track
B — Hoist Cylinder Pin
C — Rear Hinge Pin
D — Lifting Brackets
E — Maintenance Props
F — Carriage
E
E
Figure 8
Figure 9
Figure 10
INSTALLATION
A
10” Channel
10” Channel
6-1/2”
6-1/2”
A
A
C
B
D
F
TOLERANCES
(UNLESS OTHERWISE NOTED)
FRACTIONAL:
1/32"
DECIMAL:
.00 =
.01"
.000 =
.005"
ANGULAR:
1
MATERIAL
DRAWN BY
CHECKED BY
DRAWING NO.
DATE
MarkS
9/23/2020
170381-ZD0
Side Shift RCR
FINAL ASSEMBLY, RAIL RAMP
P O W E R A M P
M C G U I R E
D L M
S Y S T E M S
L o a d i n g D o c k E q u i p m e n t
This print is the property of Systems, LLC and represents a proprietary article in which Systems, LLC retains any and all
patent and other rights, including exclusive rights of use and/or manufacture and/or sale. Possession of this print does
not convey any permission to reproduce, print or manufacture the article or articles shown therein, such permission to be
granted only by written authorization signed by an officer or other authorized agent of Systems, LLC thereof.
STOCK NO.
EASTERDAY FARMS, 50K
REV A - ECN 18-066
Summary of Contents for RCR Series
Page 25: ...23 4111 0044 June 2021 2021 Systems LLC OPERATION This page intentionally left blank ...
Page 38: ...36 4111 0044 June 2021 2021 Systems LLC PARTS Platform Hydraulic Hoses C A G F E D B H ...
Page 58: ...56 4111 0044 June 2021 2021 Systems LLC This page intentionally left blank MISCELLANEOUS ...