12
4111-0008 — April 2017
June 2017
4. Before installing the leveler the embed channel
must be shimmed and welded to the embed on
the pit floor.(10 inch deep pit only.)
INSTALLATION
Install Dock Leveler
F
G
H
I
Shim
Stacking Methods
A Distance (Leveler Frame
Height)
B
Shim Location (Under
Storage Prop) (Standard
Dock Leveler Only)
C Dock Floor
D Rear Embed Frame
E Embed Frame (Storage
Prop)
F
Pyramid (Preferred)
G Stepped (Acceptable)
H Offset (Not Acceptable)
I
Straight (Not Acceptable)
The minimum size of the shim that contacts the
leveler frame (i.e., the top shim of each shim stack)
must be at least 4-1/2 x 4-1/2 in. (114.3 x 114.3
mm) to support the full width of the hoist cylinder /
storage prop weldment.
Use the thickest shim stock possible for stability
and weld penetration purposes. DO NOT use
multiple layers of 1/8 in. (3.18 mm) or thinner shim
stock.
B
C
D
A
E
E
B
E
Summary of Contents for VS series
Page 44: ...42 4111 0008 April 2017 June 2017 Centra Power Hydraulic Components PARTS A B E D F G I H C ...
Page 47: ...45 4111 0008 April 2017 June 2017 This page was left intentional left blank PARTS ...
Page 53: ...51 4111 0008 April 2017 June 2017 PARTS This page was left intentional left blank ...