PVKC-83X
STEP 3
BE CAREFUL TO ASSEMBLE ALL COMPONENTS
IN THE SEQUENCE THAT THEY ARE PRESENTED.
NOTE:
finger tighten all hardware in this step. DO NOT wrench tighten
until the last step. some components may be pre-assembled.
nylon lock nuts will not fully screw onto bolts, must wrench tighten.
3A. attach pull-up frame (G) to back frame (D) using:
2 - (#2) M10X65mm hex head bolt
4 - (#5) M10 washer
2 - (#4) M10 nylon lock nut
3B. attach back pad (I) to pull-up frame (G) using:
2 - (#3) 5/16”X2 3/4” hex head bolt
2 - (#7) 5/16” spring washer
2 - (#6) 5/16” washer
3C. insert rubber grips onto each end of pull-up
bar (H) using:
2 - (#11) 1”dia.X5” rubber grip
3D. attach pull-up bar (H) to pull-up frame (G) using:
1 - (#2) M10X65mm hex head bolt
2 - (#5) M10 washer
1 - (#4) M10 nylon lock nut
16
Summary of Contents for PVKC83X
Page 1: ...Owner s Manual PVKC 83X VERTICAL KNEE RAISE WWW BODYSOLID COM ...
Page 6: ...PVKC 83X HARDWARE LIST QUANTITY DESCRIPTION SIZE PART 6 ...
Page 11: ...PVKC 83X NOTES 11 ...
Page 13: ...13 PVKC 83X STEP 1 to the left shows STEP 1 assembled and completed ...
Page 15: ...15 PVKC 83X STEP 2 Above shows STEP 2 assembled and completed ...
Page 17: ...PVKC 83X STEP 3 17 Above shows STEP 3 assembled and completed ...
Page 18: ...18 PVKC 83X EXPLODED VIEW ...
Page 19: ...19 ...