ON series cast iron boilers are designed for working with hot water heating and/or hot water plumbing and produced with
the proper technology and materials suitable for this design.This design is restricted to use out of it's aim of use.
p p
gy
g
g
ON series boilers are delivered as sections and services assemble the boilers in the operation area The assembling of the
ON series boilers are delivered as sections and services assemble the boilers in the operation area.The assembling of the
b il
t b
d b Ri
t h i l
i
R
i
bli
f th b il
h ld l
b
d b
boiler must be made by Rima technical services . Removing or re - assembling of the boiler should also be made by
y
g
g
y
licensed Rima services, if not the risk of damage is high.
licensed Rima services, if not the risk of damage is high.
In the assembling of the boiler; there must be a proper and safe concrete platform for to put the boiler on.
In the assembling of the boiler; there must be a proper and safe concrete platform for to put the boiler on.
In the assembling of the boiler an empty space must be left from sides for safety requirements and for future repairing
In the assembling of the boiler,an empty space must be left from sides for safety requirements and for future repairing
ti
operations.
Starting and first operation of the boiler must be made by authorized Rima technicians
Starting and first operation of the boiler must be made by authorized Rima technicians.
D
t dd
t t th b il
l
bi
t
it i
ki
d h t F
ddi
t t th b il
t th
Do not add or pump water to the boiler or plumbing system as it is working and hot . For adding water to the boiler or to the
system please wait for water temperature to reach 40ºC. Circulation pump must surely be started while adding water to the
y
p
p
p
p
y
g
system . If not , the sections may crack.
system . If not , the sections may crack.
If the boiler will be kept off for a long time the electric system must be shut down from the main fuse The electric must be cut
If the boiler will be kept off for a long time the electric system must be shut down from the main fuse.The electric must be cut
off from the main shelter/fuse as the boiler is in repair service or cleaning
off from the main shelter/fuse as the boiler is in repair,service or cleaning.
In summer months when the boiler is off for a long term for preventing probable problems with circulation pumps must be
In summer months, when the boiler is off for a long term, for preventing probable problems with circulation pumps, must be
started 1 2 times per month for 5 minutes (The water with chalk can cause problems if the pump is not used for long time
started 1 -2 times per month for 5 minutes. (The water with chalk can cause problems , if the pump is not used for long time
i d )
period.)
.
The periodical controls of the boiler and the burner must be done. If not, the boiler may lose efficiency and the fuel amount
.
The periodical controls of the boiler and the burner must be done. If not, the boiler may lose efficiency and the fuel amount
used may increase.
used may increase.
The capacity choice of the boiler must be made according to the projects that prepared properly in the terms of related
p
y
g
p j
p p
p p y
standards.If not , the boiler efficiency will be low.
standards.If not , the boiler efficiency will be low.
ON series boilers are produced for heating only. For heating the sanitary water another equipment such as water heater or
p
g
y
g
y
q p
heat exchanger is needed.For proper efficiency in this operation,correct water heater or heat exchanger must be selected.
heat exchanger is needed.For proper efficiency in this operation,correct water heater or heat exchanger must be selected.
ON series boilers are delivered without burners For suitable burner selection please get in touch with Rima technicians
ON series boilers are delivered without burners. For suitable burner selection please get in touch with Rima technicians.
S it bl b
t b
l t d f t ki
hi h ffi i
Suitable burners must be selected for taking high efficiency.
g g
y
If the boiler is stopped automatically because of overheating do not add cold water to the boiler for re starting In this case
If the boiler is stopped automatically because of overheating do not add cold water to the boiler for re-starting. In this case
it f th b il t
l d
d
t
t ti
If it d
t t t l
t i
t t ith t h i l
i
wait for the boiler to cool down and re- try starting.If it does not start ,please get in contact with technical services.
In cleaning repair and other care operations the original spare parts which approved and manufactured by Rima must be
In cleaning, repair and other care operations the original spare parts which approved and manufactured by Rima , must be
used
used.
The periodical and yearly controls of the boiler must be done properly and on time Natural gas is a clean fuel and doesn't
The periodical and yearly controls of the boiler must be done properly and on time.Natural gas is a clean fuel and doesn't
k
l t f di t i th b il B t th b il
th t li id f l
d
f l
h
il
t di t C t l
d
make a lot of dirt in the boiler.But the boilers that liquid fuels are used as fuels are much more easily get dirt. Controls and
care operations of the boiler is needed for keeping high efficiency and long life of the boiler.
p
p g g
y
g
Repairing and periodical controls of ON series boilers requires profession.In this manual the responsibilities and required
Repairing and periodical controls of ON series boilers requires profession.In this manual the responsibilities and required
information for users of the boiler is declared Besides these declared operations boiler must not be started by a person
information for users of the boiler is declared. Besides these declared operations, boiler must not be started by a person
rather than the user or one of our technicians Please do not try to make adjustment or do not touch any parts of the boilers
rather than the user or one of our technicians.Please do not try to make adjustment or do not touch any parts of the boilers.
The electricity of the burner and boiler is supplied by city electric network In this case the electric and lighting systems of the
The electricity of the burner and boiler is supplied by city electric network.In this case the electric and lighting systems of the
boiler room b rner and boiler electrical connections gro nding line of control panel and boiler m st be made b
boiler room, burner and boiler electrical connections, grounding line of control panel and boiler must be made by
f
professionals under the required and related standards.
p
q
In this manual you will find informations only for the boilers. Please do not forget to get the instruction manual of the burner
In this manual you will find informations only for the boilers. Please do not forget to get the instruction manual of the burner
that you purchase from the manufacturer of it Burner is not delivered with the boiler In this case we do not give any
that you purchase from the manufacturer of it. Burner is not delivered with the boiler. In this case we do not give any
guarantee for the burner that you purchase Please get the guarantee certificate for the burner from your supplier
guarantee for the burner that you purchase. Please get the guarantee certificate for the burner from your supplier.
Please be sure that the front door (burner door) for the boiler is strictly closed and burner connections are properly made as
Please be sure that the front door (burner door) for the boiler is strictly closed and burner connections are properly made as
the boiler is working
the boiler is working.