102
4.2.2.5Assembly Oil Cooling System
1、To take a pressure resistance inspection to the Oil
Cooling System after maintenance, the pressure is 0.3MPA.a
2、After take the pressure resistance inspection, pass
over 0.03MPA compressed air through the connecting oil cooler,
steel oil pipe and Rubber Pipe for 3 minutes, and do not leak.
3、According to the disassembling order, reverse carries
on the assembly.
4、When it is finished assembly, pour the" L" engine oil,
then start the engine for 10 minutes to check whether
leaks. If it is not, the Oil Cooling System
maintenance is finish.