15
4.2.2 Test procedure
CAUTION!
The UPS is operating normally.It may take 60 seconds to boost up the
system and perform self-test completely.
◆
Switch off the MAINS to simulate utility failure, the rectifier will turn off and the battery
should feed the inverter without interruption. At this time, the LEDs of battery should be turned
on.
◆
Switch on the MAINS to simulate utility recovery, the rectifier will restart automatically
after 20 seconds and the inverter will supply to the load. It is suggested to use Dummy loads
for testing. The UPS can be loaded up to its maximum capacity during load test
。
4.2.3 MAINTENANCE BYPASS
To supply the load via Mains, you may simply active the internal mechanical bypass switch.
CAUTION!
The load is not protected by the UPS when the internal mechanical
bypass system is active and the power is not conditioned.
Switch to mechanical bypass
CAUTION!
If the UPS is running normally and can be controlled through the display,
carry out steps 1 to 5; otherwise, jump to Step 4.
◆
Open the cover of maintenance switch, the UPS turns to bypass mode automatically.
◆
Turn on MAINTANCE breaker;
◆
Open BATTERY breaker;
◆
Switch OFF the MAINS breaker,
◆
Switch OFF OUTPUT breaker;
At this time the bypass source will supply to the load through the MAINTENANCE breaker
.
Switch to normal operation (from mechanical bypass)
CAUTION!
Never attempt to switch the UPS back to normal operation until you
have verified that there are no internal UPS faults