77
Load Break Switch Control
ERT-200S
Enter the DNP address of Master station. ERT-200Srefer
this address when send Unsol message.
Communication Config/ 4. DNP Parameter / 10. Slave Address Set
Range
0 ~ 65534
Default
999
Step
1
Set RTU Address ID.
CommunicationConfig/ 4. DNP Parameter / 11. Frame Interval Set
Range
10 ~ 500 ms
Default
10 ms
Step
1 ms
Frame Interval time Setting
7.2.6.
IEC Parameter Setting
Communication Config/ 4. IEC Parameter / 1. A/L Cyclic Period Setting
Range
0 ~ 60 sec
Default
1
Step
1 sec
Setting the cycle time of the application layer
Communication Config/ 4. IEC Parameter / 2. SBO Time Out Setting
Range
1-255 sec
Default
15
Step
1 sec
Set the time interval between Select Function and
Operate Function.
Summary of Contents for ERT-200S
Page 1: ...Feeder Remote terminal Unit ERT 200S Manual www powersys kr...
Page 13: ...13 Load Break Switch Control ERT 200S 2 5 Function BlockDiagram...
Page 38: ...38 Load Break Switch Control ERT 200S 5 3 3 Menu structure tree Figure Menu Tree Structure...
Page 42: ...42 Load Break Switch Control ERT 200S...
Page 96: ...Appendix 1 Drawings 1 Enclosure Control Cabinet...