3.3.5 PPB-1 Push Button
1). PPB-1 push button is installed indoors at the height of about 100cm, so that it could be used by most people.
2). Remove the round cover (A) by prizing it out with a screwdriver. See
Figure 3.3.5 (1)
.
3). Unscrew the two screws beside the button.
4). Separate the upper shell with the bottom. See
Figure 3.3.5 (2)
.
5). Breach the three holes at the bottom and mark the points by the holes as reference.
6). Drill the holes in the wall and fix the bottom to the wall by three screws. See
Figure 3.3.5 (3)
.
3.3.6 Installation of Green Box
5). Breach the three holes at the bottom and mark the points by the holes as reference.
6). Drill the holes in the wall and fix the bottom to the wall by three screws. See
Figure 3.3.4 (5)
.
7). Connect the electric wires to the terminals as shown in
Figure 3.3.4(6)
, and it’s not required to distinguish any
polarity. The terminals can be removed for connecting the wires easily.
8). Turn the key and insert the shell on the bottom. Turn the key back to the center position and the shell will be fixed
to the bottom.
9). Tighten the lock body with the two screws and insert the round cover by pressing it to attach to the whole unit.
Figure 3.3.4 (5)
Figure 3.3.5 (1)
Figure 3.3.5 (2)
Figure 3.3.5 (3)
Figure 3.3.4 (6)
A
OFF ON
Green Box
5+
Cable
AC out
AC in
Green Box is for purpose when gate opener is in standby mode to
allow it enter the power saving mode.
Installation manner:
AC IN: connect the electricity
AC OUT: connect the power of gate opener, and connect the transformer
5V CABLE: connect 3 pins white socket of control board
Please make sure the switch of Green Box is off before proceeding the system learning and installation of device. Wait for
the system learning and installation of device to be completed, power on the Green Box
Gate opener will enter power saving mode without receiving any instruction in 1 min, and red LED light on Green Box will
be activated. Gate opener start the operation, red LED light and power saving mode will turn off.
CAUTION:
In case of loop or installation of photocell which need power consumption anytime, please do not install Green Box.
Summary of Contents for PL1000H
Page 1: ...FOR RESIDENTIAL USER MANUAL SLIDING GATE OPENERS PL600H PL1000H 24V DC MOTOR ...
Page 2: ......
Page 27: ......