R&D – PROCEDURA START-UP DT 0419 – E02
3.4
MEASUREMENTS
To access to this section, press ESC pushbutton on the main menu.
The operator can now check the value of the following electrical measurements by using the arrows < or >:
V in phase – neutral =
reserve line Y-voltage
V in phase/phase
=
reserve line voltage between lines
Input current
=
UPS input three phase currents
V out phase - neutral =
UPS output Y-voltage
V out phase/phase
= UPS output voltage between the lines
Output current
=
output current at load
Battery V,I
=
battery voltage and current
Frequency
=
UPS output frequency
UPS Temperature
=
Cabinet temperature
Power
=
Power measured at the output of the UPS (kVA)
UPS configurations =
Power save on\off output frequency 50/60Hz
If no operation is performed for 3 minutes, the “UPS STATUS AND ALARMS” menu is displayed.