POWERTRONIX SpA reserves the right to modify this document without any notice
Pag. 37 di 41
R&D – PROCEDURA START-UP DT 0419 – E02
4.12
MANAGING THE UPS BATTERY
In addition to the battery voltage and current measurements, displayed in menu “
2. MEASUREMENTS”
, it
is also possible to test the battery efficiency without any interruption to the load.
The test uses the input thyristors to lower the converter voltage until the battery discharge threshold; if the
latter is efficient, at 2V/el it starts to providing current.
In case of battery failure, the message
“BATTERY TEST FAILED”
will be displayed on the LCD.
In this situation call the technical assistance centre.