15
EBM model
It is recommended to place EBM modular to UPS’s right side.
1.Place the unit on a flat surface in its final location and install ‘Tower foot’ for stability.
2.Install the unit to ground(optional): place 4pcs bolts (M8 is recommended) to the
final location previously, bolt’s position please refer to below, then fix the unit to the
bolts.
3.3.2
RT model:
1.
This model support 2 installation modes: Rack installation and Tower installation.
2.
To keep good ventilation, please keep a free-space (500mm at least) for front / rear
panels of the module.
3.
Do not carry the front/rear panel of the module during installation.
Rack installation
This procedure is suitable for 19 inches rack cabinet installation, it is recommended
that the depth of the cabinet be no less than 800mm.
UPS model
Identify the final position and keep ‘3U’ space for this installation.
1.
Install the rail kit (if configured). This rail kit is '2U & with screw holes (M5)', the
depth of the rail kit is: 443-773 mm.